Production Description
Technical Parameter of standard prefabricated steel house:
(1). Wind resistance: Grade 11(wind speed≤ 120km/h)
(2). Earthquake resistance: Grade 7
(3). Live load capacity of roofing: 0.6kn/m2
(4). External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
(5). Second Floor Load Capacity: 150 kg/m2
(6). Live load of corridor is 2.0kn/ m2
(7). Wall permitted loading: 0.6KN/ m2
(8). Ceiling Permitted live loading: 0.5 KN/m2
(9). Wall Coefficient of thermal conductivity: K=0.442W/m2k
(10). Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K
MAIN STEEL PART of Steel Workshop
1. H section steel columns, beams and wind-proof columns
2. With treatment of one time red-oxide primer painting and two times grey facing painting
ROOF & WALL CLADDING
1. Roof & Wall Corrugated Single Steel Sheet: 0.3mm-0.6mm
2. Roof & Wall Sandwich Panel Insulated with EPS Foam, Glass wool, Rock wool and PU: 50mm-150mm
3. Transparent Sheet (FRP): 1.0mm-2.0mm
4. Flashings: Made by Color-coated Corrugated Steel Sheet
WINDOW & DOOR
1. Window: PVC Window or Aluminum-alloy Window
2. Door: Sliding Door or Roll-up Door
FASTENERS
High-strength Bolt; Common Bolt and Nut; Self-tapping Screws; Foundation Bolt and Nut, ETC
OTHER OPTIONAL ACCESSORIES
1. Gutter
2. Downpipe
3. Brick Wall: The height of brick wall is depended on client's need
4. Ventilation System
5. Lifting Height of Crane: >6m
6. Lifting Weight of Crane: 3-30T
Material List For Prefabricated House |
Main Steel Frame |
Steel column |
Fabricated by Q235 or Q345 Steel, 80*80 or 100*100 or 120*120 or 150*150 Square Tube, alkyd paiting, two primary painting, two finish painting. |
Triangular Steel structure roof |
Fabricated by Q235 or Q345 Steel, C80, C100, C120, C140 Section steel, alkyd paiting, two primary painting, two finish painting. |
Roof Purlin |
Fabricated by Q235 Steel, C80, C100, C120, C140 Section steel, alkyd paiting, two primary painting, two finish painting. |
Ordinary bolt |
4.8S, Galvanized |
Roof and Wall |
Roof Panel |
A: Insulated Steel Sandwich Panel wall
(1) Panel width: 950mm;
(2) Thickness: 50-1200mm.
(3) Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm
B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane
(1) Density of Rockwool: 120Kg/m3
(2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3
(3) Density of Polyurethane: 40Kg/m3
(4) Density of Fiber Glass:40Kg/m3, 60Kg/m3 |
Wall Panel |
A: Insulated Steel Sandwich Panel wall
(1) Panel width: 950mm;
(2) Thickness: 50-1200mm.
(3) Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm
B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane
(1) Density of Rockwool: 120Kg/m3
(2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3
(3) Density of Polyurethane: 40Kg/m3
(4) Density of Fiber Glass:40Kg/m3, 60Kg/m3 |
Edge Cover |
0.4mm galvanized color steel , angle Alu. |
Fasteners & Accessoreis |
Nails\glue ect |
Ceiling&Flooring |
Ceiling |
6mm gypsum board,with steel keel |
Plywood |
18mm film faced plywood |
Floor feather |
1.5mm PVC floor leather |
Door and window |
Door |
(1) External door: Single open door. Insulated with opening dimension 950*2100mm, furnished with lock with 3keys.
(2) Inner door: Single open door. Insulated steel door. |
Window |
4mm glass PVC window witn flying screem |
Electrical System |
Electric Cable |
(1) Three diferent color.
(2) Lighting: 2.5m m2.
(3) Air condition: 4.0mm2.
(4) BV cable, solid core. |
PVC Wire Channel |
PVC wire channel |
Lights |
Double tube fluorescent lamp, 220V,50-60HZ |
Switches |
Single Switch, with junction box |
Socket |
16A five hole univesal socket. |
Power Distribution Cabinet |
Box+breakers+earth leakage protective device |
Water&Plumbing system(choose) |
Water drain pipe |
(1) PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years.
(2) Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC |
Sanitary ware |
(1) Western Close tool: ceramic, with pipes and installation fittings
(2) Urinal: ceramic, with pipes and installation fittings
(3) Wash basin: ceramic, with post, faucet, pipes and installation fittings
(4) Shower head, Shower base, Water mixture |
Plumbing System and Rain Water Drainage System as per building design |
Our technical advantages:
1) Stable and Earthquake Resistance;
2) Wind resistance;
3) Long using time up to 50 years;
4) Sound insulation;
5) Environment friendly: Most of the excess material can be 100% recycled;
6) Fast construction, time saving and labor saving;
7) Lower cost and maintenance.ergy conserving and environment protection.
Usage:
Homes, Residence, Accommodation, Hostel, Office, Reception house, Rest-room, Show-room, Public-accommodation, Place of recreation and so on.
Our excellent design team will design the steel prefab workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
Project Name |
steel structure poultry house |
Size |
total length and width, roof and eave height, roof pitch, etc |
Roof and Wall |
option: EPS, fiber glass, rock wool or PU sandwich panel |
Door and Window |
PVC or Aluminum alloy; sliding door or rolled door |
Column and Beam |
option:hot rooled or welded H section, I section; painting or galvanized |
Purlin |
option:C-Section or Z-section |
Local Climate |
1.wind speed
2.snow load
3.rain quantity
4.earthquake grade if have
More details is preferred. |
Others |
|
Drawing |
1. according to clients' drawing |
2. design as per clients' dimension and requests |
Package |
Naked loaded in shipping container or as per requests. |
Loading |
20 GP, 40HP, 40 GP, 40 OT |
PACKING&SHIPPING
All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40'HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.
Good relationship with many vessel companies to make sure the transportation smooth.
COMPANY INFORMATION
Qingdao Gemsun Steel Structure Co., Ltd. is a large scale professional steel structure company specialized in the steel designing, production and installation. The company is located at the Northern Industrial Park of Qingdao---the new hot spot for economy and investment. With a total building area of 10000 square meters, our company owns many domestic advanced equipment, such as two steel structure automatic welding lines, two color steel molding lines, production lines for the C-section and Z-section steel purlins, and various production equipment for automatic cut and welding. Our main advantage is that we have our own hot dip galvanize production line, the galvanize bath is 12.5M, which is the biggest galvanize factory in Qingdao.
There are more than 200 employees in the company, among which there are 20 senior and intermediate engineers and technicians. During last 15 years export experiences, our company had both ISO and CE certificates, and our buildings can meets standards from all over the world.
OUR SERVICE
1) Quotation send to you according to your drawing.
2) Engineer with rich experience design drawing according to client's requirement.
3) We offer whole building for client, such as design, manufacture, and installation.
*Pre-sale service
1. Customized drawing designing free of charge
2. Professional advice according the site conditions
3. Settle transportation affair
*Construction stage
1. Supply you with detailed construction drawing to guide
2. Send one engineer to your local
3. Provide related production for your reference
*After-sale service
1. Reasonable advice for usage, maintenance, technically improve
2. Unique engineer be in charge of your project
3. On-site service
FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.