China Design Prefabricated Steel Structure Building with CE Certification
Advantage:
High quake-proof, water proof and fire proof, High space efficiency
Easy to install and maintenance
Fast construction, save time and labor cost
Prefabricated and customized design
Nice appearance
Light weight, high strength, 50years durable use, no construction waste.
Easy move, materials can be recycled used, environmentally;
Used as factory, warehouse, office building, aircraft hangar etc;
Structural durabilities, low maintenance.
Technical Parameters:
1. Main Steel Structure: Use build-up steel column, welded H-beam steel
2. Purlin: C-type steel
3. Roop panel: Single steel sheet or sandwich panel
4. Wall panel: The same to roof panel
5. Tie bar: Welded-round tube
6. Brace: Round steel
7. Column brace and lateral brace: Angle steel.
8. Crane: 3T-30T
9. Angle brace: Hot-rolled angle steel
10. Edge: Color plate
11. Gutter: Stainless steel
12. Down pipe: PVC Pipe
13. Door: Sandwich-panel door or Rolling door
14. Window: Aluminum alloy window or PVC window
Product Description:
Product Name |
China design refabricated Steel Structure Building with CE Certification |
Size |
Based on your requirement |
Column |
Length |
4000-12000mm |
Main Component
|
Thickness |
web plate 6-40mm |
Height |
200-1200mm |
Color |
Available |
Base |
cement and steel foundation bolts |
Main Frame |
Welded H beam; Hot rolling section beam |
Material |
Q345B;Q235 |
Purlin |
C purlin or Z Purlin size from C 120 - 320 , Z 100 -20 |
Bracing |
X type or other type bracing made from angle and round pipe |
Bolt |
general bolt and high -strength bolts |
Roof and Wall |
sandwich panel and steel corrugated sheet |
Door |
sliding and rolling up door |
Window |
sliding aplastic steel window or aluminiun alloy window |
Frame surface |
painted or hot dip galvanized |
Sheet |
0.35 -0.8 mm galvanized sheet |
Accessory |
semi - transparent skylight belts , ventilators , downpipe and galvanized gutter etc . |
Project view:
Company Profile:
Our Service:
1. Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building:
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision:
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK
Packing & Delivery:
Inspection: 50% inline inspection and 100% full final inspection, make sure all output w/o any mistake
Packing: per customer's requirements or per product sizes, full protection packing
Shipping: per customer's requirements or per container sizes
FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Contact Info:
Lucy Lu Qingdao Gemsun steel structure co., Ltd
|