Customization: | Available |
---|---|
Usage: | Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Godown |
Roof and Wall Material: | EPS Sandwich Panel/Glasswool Sandwich Panel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Size(m) | Length*Width* Eave height |
Foundation | Steel foundation with anchor bolts |
Column and Beam | Material:Q235 or Q345 |
Bracing | X Bracinng made by angel steel,round bar etc. |
C or Z Purlin | Size:C120~C320mm;Z100~Z300mm |
Wall and Roof Panel | Single corrugated steel sheet and Sandwich panel insulation with EPS, PU or Rock wool |
Surface Treatment | Hot galvanized or Painting with any color according to your request |
Our professional engineer and design team will provide the steel structure drawings for you.Please just let me know the informations as below.
1. Measurement: length, width, eave height
2. Area and local climate: wind speed, snow load and earthquake magnitude etc.
3. The materials of the roof and the wall you want,usually it can be corrugated steel sheet and sandwich panel.
4. If need crane. If yes, please tell me the max lifting weight and max lifting height.
5. Any other requirements,please also inform us.
6. If you have your own drawings,please feel free to send us for the detailed quotation.
1.You are manufacture factory or trading company?
A: We are manufacture factory. The largest Hot Dip Galvanize Bath in Qingdao is owned by us .And you are welcomed to visit us for inspection. The quality control flow will show you our professional.
2.Is your price competitive with other companies?
A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
3.Do you offer service for installation?
A: We will give detailed installation drawings and direction info for free. And we could send engineers as installation director even a team.
4.Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.