• Easy to Install Low Cost Pre-Fabricated Steel Structure Building
  • Easy to Install Low Cost Pre-Fabricated Steel Structure Building
  • Easy to Install Low Cost Pre-Fabricated Steel Structure Building
  • Easy to Install Low Cost Pre-Fabricated Steel Structure Building
  • Easy to Install Low Cost Pre-Fabricated Steel Structure Building
  • Easy to Install Low Cost Pre-Fabricated Steel Structure Building

Easy to Install Low Cost Pre-Fabricated Steel Structure Building

Type: H-Section Steel
Standard: GB, ASTM
Trademark: Carbon Structural Steel, OEM
Forming: Welded
Connection Form: Bolt Connection
Member: Steel Beam
Customization:

Contact Supplier

Diamond Member Since 2015

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory

Basic Info.

Model NO.
ST-0027
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q345b
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Surafce
Painting and Hot DIP Galvanize
Size
According to Customer Requirement
Steel Grade
Q235 and Q345b
Transport Package
Plastic Film
Origin
Qingdao, China
HS Code
7308900000
Production Capacity
5000t Per Year

Product Description

Easy to Install Low cost Pre-Fabricated Steel Structure Building

PRODUCTION DESCRIPTION
Easy to Install Low Cost Pre-Fabricated Steel Structure Building
Easy to Install Low Cost Pre-Fabricated Steel Structure Building

Easy to Install Low Cost Pre-Fabricated Steel Structure Building

 
 Main steel frame   Q235/Q345 Welded H Beam and Hot Rolled Section Steel
Surface Painted or Hot Dip Galvanized
Roof & Wall Panel EPS Sandwich panel /Single Corrugated Steel Sheet/ Colour sheet with Glass-wool, for customers choose
Window PVC Steel or Aluminum Alloy
Door Sliding Door or Rolling Up Door
Connecting  intensive bolt,  post feet bolt
Service
Design, Fabrication and Installation
We can make quotation according to customer's drawing or requirement (size by length/width/height and wind speed), offering a free design drawing and all detailed drawings for installation.
Design software:  Auto CAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc
Packing
According to customer's requirement
Load into 40/20GP,40HQ or 40OT
 

Steel Structure Workshop, Prefabricated Steel Structure Building:
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO: 9001: 2008
3. Cost considering: Time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.

Technical Parameters:
1. Main Steel Structure: Use build-up steel column, welded H-beam steel
2. Purlin: C-type steel
3. Roop panel: Single steel sheet or sandwich panel
4. Wall panel: The same to roof panel
5. Tie bar: Welded-round tube
6. Brace: Round steel
7. Column brace and lateral brace: Angle steel
8. Crane: 3T-30T
9. Angle brace: Hot-rolled angle steel
10. Edge: Color plate
11. Gutter: Stainless steel
12. Down pipe: PVC Pipe
13. Door: Sandwich-panel door or Rolling door
14. Window: Aluminum alloy window or PVC window

This building can used forPrefabricated House,steel structure building,steel structure workshop, steel structure warehouse,steel structure storage,steel structure station ,light steel structure etc.

Project view:
Easy to Install Low Cost Pre-Fabricated Steel Structure Building
Easy to Install Low Cost Pre-Fabricated Steel Structure Building

Company Profile:

Easy to Install Low Cost Pre-Fabricated Steel Structure Building
Easy to Install Low Cost Pre-Fabricated Steel Structure Building
Easy to Install Low Cost Pre-Fabricated Steel Structure Building
Easy to Install Low Cost Pre-Fabricated Steel Structure Building

Our Service:
1. Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp as per your requirement. 

2. Procurement and Manufacture for all material for prefabricated building
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.

3. Site management & Installation supervision:
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK


Packing & Delivery:
Inspection: 50% inline inspection and 100% full final inspection, make sure all output w/o any mistake
Packing: per customer's requirements or per product sizes, full protection packing
Shipping: per customer's requirements or per container sizes

Easy to Install Low Cost Pre-Fabricated Steel Structure Building

FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
 
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
 
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
 
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
avatar Miss Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2015

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
Registered Capital
500000 RMB
Plant Area
>2000 square meters